Material

Bathroom Furniture

Assembled

City, Kensington, New York and London
All products are delivered fully assembled. Handles, Lighting and Taps are optional and should be fitted by a qualified installer.


Traditional
All products are delivered fully assembled. Handles and lighting are optional which should be fitted by a qualified installer .

Bathroom Furniture

Material

City Is largely made from compact laminated board materials
Kensington Is largely made of white painted mdf.
London Is largely made ​​of veneered panel materials. Drawer fronts and doors in natural oak are made of solid oak, filling in veneered panel materials. White and light grey furniture is made of painted MDF. Backs, shelves, etc. are made of veneered or foiled panel materials.
New York Is largely made ​​of veneered panel materials. White furniture is made of painted MDF. Backs, shelves, etc. are made of veneered or foiled panel materials.
Traditional Is largely made ​​of MDF and solid birch. Back boards are made ​​of painted or foiled panel materials.

Finish Before assembly all parts are coated at least 2 times with the best available water repellent and hardwearing lacquer.

Material facts

Ceramic Basins

The ceramic basins are made from natural materials with tolerances +/- 5 %. All basins should be carefully inspected prior to installation. If a product is found to be defective through incorrect fitting Miller from Sweden will not be held liable. We strongly recommend that all ceramic items should be installed by a qualified fitter. Basins must be quality checked before installation. Basins 116W1, 117W1, 132W, 133W, 135W, 136W, 150W, 151W, 171W1, 173W1, 174W1 are branded with the Italian manufacturers logo.

Material Facts

Electric

All electrical items should be installed by qualified electricians.
Lighting, Mirror Cabinets and Mirrors Have LED IP44 rated lights.
 

Traditional Lighting is IP23 rated. Delivered without light E14 socket bulb.

Material Facts

Installation Notice

Supplied screws and plugs must be used in solid walls. Before drilling the holes, check that there are no hidden pipes or electrical cables. We recommend that holes that are drilled be filled abundantly with silicone for wet areas before installation.

All products must be inspected and approved prior to installation. A competent professional must always perform the job. Miller From Sweden Ltd. takes no responsibility for incorrect/unauthorized installations.